Mabani Steel was established in 2006 in Ras Al Kahimah (RAK), United Arab Emirates (UAE).

David Pieris Motor Company – Ranna, Hambantota

Mabani Steel is recognised as the largest and most innovative manufacturer of Pre-Engineered Steel Buildings (PEB) and Hot Rolled Structural Steel (HRSS) having a state-of-the-art production facility in the Middle East and having a production capacity of 72,000 MT of PEB and 24,000 MT of HRSS per annum.

Mabani Steel has positioned itself as the most honest and most transparent PEB manufacturer in the GCC and has consistently beaten its competitors on price and speed of delivery. It is the only PEB manufacturer that complies with the latest USA codes applicable to steel buildings.

Mabani Steel is managed by Muayyad Khudairi, President and Ken Krieger, Vice President, a team that has worked together in the PEB industry in this region for over 30 years and has been responsible for the success of the three largest and most successful PEB companies in this region.

Mabani Steel is such a great company. It has risen from a startup in 2006 to become the preferred designer, fabricator and erector of pre-engineered steel buildings (PEB) in the Middle East, Africa and Asia. It is the fastest growing PEB supplier in history. No PEB supplier has ever before risen from “0” metric tons (MT) shipments to a 12 months average monthly shipment of 4,150 MT in less than three years. Less than three years after the start of production in April 2007, Mabani is recognised by consultants, specialised PEB contractors, general contractors and owners, in their target market, as a new benchmark in PEB.

The application of Mabani Steel PEB and HRSS include factory buildings, workshops, warehouses, distribution centres, supermarkets, showrooms, offices, equipment supporting platforms, cement factories, steel mills, power plants, petrochemicals plants and literally every building usage that can be envisioned.

Global Building Systems has been appointed as distributor/certified builder in Sri Lanka who is the pioneer in PEB, HRSS, robot car park, space frame, tension membranes and moduler housing. Global Building Systems has negotiated, secured and contracted the projects such as David Pieris Motor Company – Ranna, Hambatota, Unilever Sri Lanka – ‘PROJECT MORPH’, export processing zone, Horana and Industrial Clothing – Sithawaka export processing zone, Awissawella.